A unified digital command center for construction owners, project management consultants, supervision consultants and contractors — connecting schedule, cost, quality, safety, acceptance records and project documentation in one real-time platform.

Construction Project Management & Supervision Platform

All products

NAIT role
Product Consulting · Product Design · Software Engineering
Selected Product Partnership
PEAK is not owned by NAIT. It is developed by NAIT in partnership with the product owner, with NAIT responsible for product consulting, product design and software engineering.

The core idea

From declared progress to evidence-backed progress.

PEAK distinguishes between values declared by a party and values confirmed through acceptance evidence. Progress that has been signed off against records reads differently from progress that has only been reported — and the platform keeps that distinction visible.

Screenshots

  • PEAK dashboard with an S-curve progress chart and a planned-versus-actual cost chart
    Executive cockpit — S-curve and cost
  • PEAK quality and safety dashboard with defect and incident charts and an open-defect list
    Quality and HSE
  • PEAK in-app assistant offering project commands such as raising a defect record
    In-app project assistant
PEAK Gantt chart with the critical path highlighted and a today marker
Gantt and critical path

Screenshots of the PEAK product, published with the approval of the product owner. All figures shown are demonstration data, not real project values.

Built for

  • Project Owners
  • Project Management Consultants / PMC
  • Supervision Consultants
  • Contractors

Domain coverage

  • Executive cockpit

    Portfolio and project status in one view

  • EVM

    Earned value, SPI and CPI tracking

  • Schedule / CPM

    Gantt, critical path and baselines

  • Cost

    Budget, commitment and actual cost

  • Change Orders

    Variations and their schedule and cost impact

  • QA/QC

    Inspection, checklists and non-conformance

  • HSE

    Safety observations, incidents and corrective action

  • Contractors

    Packages, scope and performance

  • Acceptance

    Records that confirm declared progress

  • Project documentation

    Drawings, submittals and revisions

  • Decisions

    Decision log with owners and dates

  • RFI

    Requests for information and their resolution

  • Collaboration

    Multi-party discussion tied to the record

  • Realtime

    Shared, current project state

  • Mobile

    Field capture on site

  • Offline field operation

    Capture without connectivity, sync later

  • Multi-organization environment

    Owner, PMC, supervision and contractors

What NAIT contributes

  • 01

    Product consulting

    Domain modelling, product scope and the operating logic behind schedule, cost, quality and acceptance.

  • 02

    Product design

    Information architecture and interface design for multi-organization users working in the office and on site.

  • 03

    Software engineering

    Platform engineering, real-time data, mobile and offline field capture, and integration work.

Vietnamese construction practice

PEAK is designed around the record types, acceptance stages and documentation used in Vietnamese construction practice, so project records can be maintained in the format teams already work with.

This is a description of product design intent. It is not a legal or regulatory compliance guarantee. Compliance remains the responsibility of the project parties and their legal advisers.